Consultancy for Feasibility Studies, Baseline Studies, ESIA and RAP for Cheptui Hydropower Project in Kapchorwa District

Client Cheptui Hydropower Company
Funder Equity Bank
Project Cost USD 300,789
Status Completed
Water and Energy Infrastructure

Feasibility studies, ESIA and RAP for the Cheptui hydropower project in mountainous terrain.

Key Activities

  • Performing baseline hydrological, geological, and ecological data collection in mountainous terrain.
  • Conducting feasibility analysis for power generation capacity and grid interconnection.
  • Preparing statutory ESIA and RAP documentation for regulatory approval.
  • Designing stakeholder consultation frameworks tailored to indigenous and local communities.