Water and Energy Infrastructure
Feasibility studies, ESIA and RAP for the Cheptui hydropower project in mountainous terrain.
Key Activities
- Performing baseline hydrological, geological, and ecological data collection in mountainous terrain.
- Conducting feasibility analysis for power generation capacity and grid interconnection.
- Preparing statutory ESIA and RAP documentation for regulatory approval.
- Designing stakeholder consultation frameworks tailored to indigenous and local communities.