Water and Energy Infrastructure
Feasibility study and preliminary design for urban water supply infrastructure in eastern Uganda.
Key Activities
- Assessing water source yields (surface and groundwater) and water demand projections.
- Conducting preliminary engineering design for abstraction, treatment plants, transmission mains, and distribution networks.
- Performing environmental and social screening for water infrastructure sites.
- Preparing feasibility reports and investment cost estimates.